Sign In | Join Free | My uabig.com
China Henan Tianfon New Energy Tech. Co., Ltd logo
Henan Tianfon New Energy Tech. Co., Ltd
Henan Tianfon New Energy Tech. Co., Ltd.
Verified Supplier

7 Years

Home > Solar System Components >

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Henan Tianfon New Energy Tech. Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

500~2500mm Length Ground Mounting Screw Pile Driving Rack

  • 1
  • 2
  • 3

Brand Name : TIANFON

Model Number : Ground Screw Piles

Certification : SGS,ISO 9001,ISO 14001,OHSAS 18000

Place of Origin : CHINA

MOQ : 5 set

Price : USD800-2000/set

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 30MW/month

Delivery Time : 15-25 work days

Packaging Details : standard export packing

Install site : All types of Soil

Material : Steel Q235B

Diameters : 76 mm~200 mm

Thickness : 3~3.5mm

Anticorrosive : High class hot dip galvanized

Length : 500~2500 mm

Contact Now

500~2500mm Length Customize Design Ground Mounting Screw Pile Driving Rack

Ground Screw Piles is the preferred foundation in many applications, such as Photovoltaic Solar Farm construction, Timber-frame Housing, Timber Decking, Street Light and Fence construction, Temporary Site Accommodation, Bill Board/Advertising Signs and many more applications.

Specifications:

Name

Size(mm)

Thickness(mm)

Material

Surface treatment

Photo

Piles with flange

φ 76/89,1000-2000mm(Length)

4

Q235B

Hot-Dip Galvanizing

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Piles without flange

φ 76/89,1000-2000mm(Length)

4

Q235B

Hot-Dip Galvanizing

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Steel pipe piles

φ 76/89,1000-2000mm(Length)

4

Q236B

Hot-Dip Galvanizing

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Products can be customized according to customer requirement.

Features:

Are cost effective

Can be installed through ground water without casing

Can be removed for temporary applications

Are easily transported to remote sites

Typically required less time to install

Torque is a strong verification of capacity

Reduce the number of truck trips to a site

Eliminate concrete curing and formwork

Can be installed at a better angle for added laterial risistance

Can be installed with smaller more accessible equipment

Are installed with low noise and minimal vibrations

Can be galvanized for corrosion resistance

Minimize disturbance to environmentally sensitive sites

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Packaging and delivery:

► Port: Tianjin, Shanghai, Qingdao

► Package: strong and long distance transportation package

► Payment Terms: L/C,D/A,D/P,T/T

► Delivery Detail: Delivery time:7--25 days after receiving customer’s deposits

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Our Certificates:

500~2500mm Length Ground Mounting Screw Pile Driving Rack

500~2500mm Length Ground Mounting Screw Pile Driving Rack


Product Tags:

2500mm Ground Mounting Screw Pile

      

500mm Ground Mounting Screw Pile

      
Wholesale 500~2500mm Length Ground Mounting Screw Pile Driving Rack from china suppliers

500~2500mm Length Ground Mounting Screw Pile Driving Rack Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Henan Tianfon New Energy Tech. Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)